
The safe steaming process, step by step
Every job follows the same five steps — inspection, protection, steam, controlled removal, and snow-load clearing. Careful work, in the right order.
How we work
Five steps, zero shortcuts
The order matters: understand the dam, protect the property, melt the ice, restore drainage, then remove what feeds the problem.

Step 1
Roof Inspection
We assess ice dam severity and identify problem areas — where the ice has built up, where water is being trapped, and what the roof needs first.

Step 2
Protection Setup
We set up ladders, safety equipment, and property protection — shielding landscaping, siding, and walkways from falling ice and snow before work begins.

Step 3
Pure Steam Application
We apply controlled low-pressure steam to gently melt the ice — heat, not force — minimizing the risk of roof damage while the dam releases.

Step 4
Controlled Removal
We carefully remove ice and create drainage channels, working from the base upward so meltwater keeps moving off the roof as the dam comes down.

Step 5
Snow Load Clearing
We address accumulated roof snow as appropriate to help restore drainage and reduce the conditions contributing to ice dams.
Why steam instead of pressure washers?
Pressure washers attack ice with force — and that force doesn't stop at the ice. High-pressure water can strip shingle granules and cut into roofing. Steam melts the ice with heat, so the roof surface underneath stays as untouched as possible.
Emergency response
Dealing with an ice dam right now?
Active leaks, spreading ceiling stains, or a heavy ice ridge won't wait for a form response. Call us directly and we'll talk through your situation.
(218) 457-4170Talk to the crew
Describe what you're seeing — where the ice is, what the ceilings are doing — and we'll tell you what it needs.
